Real Shot From Factory-Metal Dome Placement

The placement personnel will select the metal dome of the appropriate size according to the order design drawings, first use the spacer glue to bond with the lower circuit, and at the same time fix the metal dome on the lower circuit pad. This is one of the most important steps of customized membrane panels.
Metal Dome, Circuit Pad, Customized Membrane Panels, Design Drawings
Release time:Jan 12, 2021320

0